Accepted Material from In-Process - Assemlies, Ver 4.0

After accepting material (that was failed at the assembly operation)
at the quality disposition assembly tab or DMR processing the
quantity is not posted back to the operation as good parts. How is
anyone dealing with this currently. I am trying to identify how much
product is in the system including rejected material at any given
time.

David Hogue
Dynacast Inc.
dhogue@...