Bill Of Materials DMT - Plant

Hello,

In DMT > Engineering > Bill of Operations.
If we look at the template, there is field name ‘Plant’ as part of ECOOpr. However Plant does not exist as a field in the ECOOpr table ? Where is the system looking for Plant as part of the Bill of Operations ?

The “Plant” field is required for the Part Revision, which is effectively a parent table to the ECOOpr table.

1 Like

You can specify different methods of manufacture for different sites.

We are not multi-site so I am not 100% sure but I believe plant in this context is tied to the revision.

1 Like

Thanks Both