# BPM external method with Db **Category:** [Epicor ERP 10](https://www.epiusers.help/c/e10/5) **Created:** 2016-10-24 08:14 UTC **Views:** 884 **Replies:** 0 **URL:** https://www.epiusers.help/t/bpm-external-method-with-db/35927 --- ## Post #1 by @bmanners I am trying to create either a method or data directive that uses an external method with access to the Db context so that i can bring other tables into scope. I have read here https://epiusers.help/t/using-callcontextbpmdata-and-db-in-an-external-bpm/33877 but I must be doing something wrong as when I inherit from an abstract class the method is no longer available to be used in the BPM. We are on E10.1.400.12 any thoughts? Thanks Brett --- **Canonical:** https://www.epiusers.help/t/bpm-external-method-with-db/35927 **Original content:** https://www.epiusers.help/t/bpm-external-method-with-db/35927