Can you merge Operations in Phantom BOMs?

We have a number of top level parts that are manufactured in a single operation which we would like to record labour against. Each part includes a number of subassemblies that are common to other parts. We would like to include a manufacturing operation, all of which are the same IE Assembly, and materials in the Methods of these subassemblies.

When we put a job on the system Vantage merge's the materials into a flat BOM for manufacturing, which is great, but it doesn't merge the Like-for-like operations. Is there a way we can achieve this in Vantage? Or does it require us to restructure our BOMs?

Vantage 8.03.408B (SQL)

Thanks,

Mark
1 Like