Costing Miscellaneous Charges

We are on Version 4, and we have AP interface on, but Inventory interface
off.

When we put in an AP invoice, if the line item is to a job and we add the
miscellaneous charge to the line, this charge does flow through to the job.

If we add the misc charge to the Header, the charge does not flow through to
the job. This was the same in 3.0 as well.



---------------------------------
Is there any way to get the miscellaneous charges such as freight or
expediting charges to flow to the job/stock?

Purchasing doesn't want to change the unit price of the item and
Engineering doesn't want to add a line item.

I would have thought that miscellaneous charges added to the line
would have flowed with the item. Am I missing something?
Is there any way to get the miscellaneous charges such as freight or
expediting charges to flow to the job/stock?

Purchasing doesn't want to change the unit price of the item and
Engineering doesn't want to add a line item.

I would have thought that miscellaneous charges added to the line
would have flowed with the item. Am I missing something?

• Rob McFarlin, Controller
• Accel Group, Inc.
325 Quadral Dr.
Wadsworth, OH 44281
• (330)336-0317 x114
• FAX(330)336-1224