Documents linked through Process Inspection

Anyone? . . .




--- In vantage@yahoogroups.com, "Sean Toler" <seantoler@k...> wrote:
>
> In both versions 6.10 and 8.00 I have noticed that if one links a
> document to a specific nonconformance through the Inspection
> Processing module, that once the nonconformance is closed, that
> document can not be found anywhere in the records of the job. But,
if
> one is to link a document through Job Entry, then that document is
> viewable in , say, Job Tracker.
>
> Does anyone know of a location where a document that is linked to in
> the Inspection Processing module can be viewed within a job?
>
> If not,
>
> Then does anyone know what the purpose of linking a document through
> Inspection Processing is if it can not be viewed?
>
In both versions 6.10 and 8.00 I have noticed that if one links a
document to a specific nonconformance through the Inspection
Processing module, that once the nonconformance is closed, that
document can not be found anywhere in the records of the job. But, if
one is to link a document through Job Entry, then that document is
viewable in , say, Job Tracker.

Does anyone know of a location where a document that is linked to in
the Inspection Processing module can be viewed within a job?

If not,

Then does anyone know what the purpose of linking a document through
Inspection Processing is if it can not be viewed?