In my MOM I have a set of operation holders. I am able to change them to the operation of my choice by setting the opcode. Same with my materials all good and change as needed.
My problem is with the resources/OpDtl records. I cannot get the crew size for either setup or production to pass. I believe the problem is because the holder resources are overwritten when I do the rule function to pull in the operation of choice. So then where do I put the rules? I have put the set crewsize statements in every location I can think of except obviously the one that works.
This is for our pattern shop, so I can’t make a MOM with all operations, there are too many and they can be used multiple times and different order.
What am I missing. Something small, stupid and easily fixed I hope.
Brenda
E10.0.700.2