Hi,
We have Epicor 9 set up in metric minutes (i.e. 100 minutes/hr).
However this alters all of the occurances of times on the system.
Does anyone know how I can add a calculated field so it converts 100min/hr hour and minutes to 60min/hr hour and minutes?
i.e. - E9 says 12.5 which is 12 hours and 1/2. However, in some instances it is confusing and is easier if it were to say 12:30 or 12.30 meaning 30 minutes past twelve (standard clock).
Obiously I can convert the minutes easily by multiplying the 0.5 by 60 which will give me 30 minutes.
In the calculated fields, I have noticed a Time format but don't know how to use it.
Any help would be appreciated.
Cheers,
CHRIS THOMPSON
[Non-text portions of this message have been removed]
We have Epicor 9 set up in metric minutes (i.e. 100 minutes/hr).
However this alters all of the occurances of times on the system.
Does anyone know how I can add a calculated field so it converts 100min/hr hour and minutes to 60min/hr hour and minutes?
i.e. - E9 says 12.5 which is 12 hours and 1/2. However, in some instances it is confusing and is easier if it were to say 12:30 or 12.30 meaning 30 minutes past twelve (standard clock).
Obiously I can convert the minutes easily by multiplying the 0.5 by 60 which will give me 30 minutes.
In the calculated fields, I have noticed a Time format but don't know how to use it.
Any help would be appreciated.
Cheers,
CHRIS THOMPSON
[Non-text portions of this message have been removed]