I am thinking this is part specific because these are the only 2 parts I am having this issue with. Does anyone have any recommendations as to what to look at in the Part Maintenance of these parts to figure out why these are acting this way?
You have to set that operation as the final op. In The Job Entry screen go to Details > Operations > Detail. Look at the bottom right for Final Operation. Check it off so that scheduling knows this is the final op.
Thank you for this information. We are able to force the job to be closed but the original question still remains the problem. What on the part maintenance level of this specific part is set or not setup properly for the job scheduling to recognize the Final operation schedule date??
Like @gpayne said, I think this is not at the part level, it is at the MOM level. Look into engineering workbench at your approved revs. Make sure the approved rev has the operations setup correctly.
Thank you all for your input and help on this matter. I did some testing and sucess was had. We checked the Final operation check box on the operation in the MOM and this fixed the problem.
Problem solved
Nancy