# How are Sites, Warehouoses and Parts linked to a Cost ID **Category:** [Epicor ERP 10](https://www.epiusers.help/c/e10/5) **Created:** 2016-11-02 15:26 UTC **Views:** 1636 **Replies:** 3 **URL:** https://www.epiusers.help/t/how-are-sites-warehouoses-and-parts-linked-to-a-cost-id/36066 --- ## Post #1 by @dpetet We are setting up a new warehouse that I want to link to a new Site ID. I then want to transfer existing parts into that warehouse. I am trying to understand how the warehouse is linked to the new Cost ID. I don't see any logical way to assign the Warehouse to a Site, or to the related Cost ID. Is this done at the part level? From the tech ref guide I can see that there is a hierarchy - Company-> Site-> Warehouse-> Bin. So it would seem a Warehouse is associated with a Site (which has a unique Cost ID). I just don't see how the Warehouse and the Site are linked - it's also confusing that a Warehouse can be used by multiple sites. I understand that from a practicality standpoint, but not in how the Warehouse is linked to a site (and a related Site ID). Anyone understand these relationships? Thanks. --- ## Post #2 by @amaragni Warehouses are within SITEs in SITE CONFIG - Sites has a COST IT associated wiith them CHeck Company setup for SITE MAINTENANCE --- ## Post #3 by @dpetet Great, thanks for the info. I believe Site Configure is probably what I needed. I will post if I find the linkage details so maybe the next person can get there faster than I did... --- ## Post #4 by @amaragni great. it appears complex - but you're looking in the right spot now and should be good --- **Canonical:** https://www.epiusers.help/t/how-are-sites-warehouoses-and-parts-linked-to-a-cost-id/36066 **Original content:** https://www.epiusers.help/t/how-are-sites-warehouoses-and-parts-linked-to-a-cost-id/36066