What effect does ordering revision A over B have on the system as a whole? Example we have a paper bag that the color of the paper will change. Part number should stay the same, but we want to sell out of rev A and start selling rev B otherwise make sense? It appears even though rev B was ordered in specific that shipping can only ship from as the main part.