I have a materials list that was created using the Engineering Workbench for a configurable part. How do I get material/parts changes made in the Engineering Workbench to update in Method Rules of a configuration that I setup in E9 with Configuration Designer?
There is only one revision and I have changed the material list in the Engineering Workbench. I cannot get the changes made in the related Engineering Workbench to update to the Method Rules in the Configuration Designer for the same configurable part.
There is only one revision and I have changed the material list in the Engineering Workbench. I cannot get the changes made in the related Engineering Workbench to update to the Method Rules in the Configuration Designer for the same configurable part.