Is this BPM Possible?

Yes this is possible.


*Jose C Gomez*
*Software Engineer*
*
*
*
*T: 904.469.1524 mobile
E: jose@...
http://www.josecgomez.com
<http://www.linkedin.com/in/josecgomez> <http://www.facebook.com/josegomez>
<http://www.google.com/profiles/jose.gomez> <http://www.twitter.com/joc85>
<http://www.josecgomez.com/professional-resume/>
<http://www.josecgomez.com/feed/>
<http://www.usdoingstuff.com>

*Quis custodiet ipsos custodes?*


On Wed, Feb 20, 2013 at 10:50 AM, neverunmacron <neverunmacron@...>wrote:

> **
>
>
> Good Morning,
>
> i was wondering could it be possible to create a BPM where it can look for
> the part number in a ud table and retrieve the cost and enter it in cost
> adjustment table? I am using vantage 8.03.409c.
>
> The reason i ask is because we have our BOM outside the system and when
> there is price increases in the raw materials, i have to manually enter the
> cost for each fg. We dont use jobs either so thats why we dont use the BOM
> in Vantage. thanks
>
> Jose
>
>
>


[Non-text portions of this message have been removed]
Good Morning,

i was wondering could it be possible to create a BPM where it can look for the part number in a ud table and retrieve the cost and enter it in cost adjustment table? I am using vantage 8.03.409c.

The reason i ask is because we have our BOM outside the system and when there is price increases in the raw materials, i have to manually enter the cost for each fg. We dont use jobs either so thats why we dont use the BOM in Vantage. thanks

Jose