Issuing material back from a job

Thanks Edward

That worked great. :-)




--- In vantage@yahoogroups.com, "Edward F. Fox, Jr." <efox@...> wrote:
>
> Enter .00001 as the required qty. It rill round to 0 required.
>
>
> Edward F. Fox, Jr., CPA
>
> Controller
>
> Maxson Automatic Machinery Company
>
> Phone 401-596-0162 a Fax 401-596-1050
>
> www.maxsonautomatic.com <http://www.maxsonautomatic.com/>
>
>
>
> _____
>
> From: rwhalebelly [mailto:richard.whalebelly@...]
> Sent: Friday, May 25, 2007 10:39 AM
> To: vantage@yahoogroups.com
> Subject: [Vantage] Issuing material back from a job
>
>
>
> I must be missing something but can someone explain how I can do
the
> following.
>
> I have a job which has a kit of parts issued to it. However that
kit of
> parts is no longer required for the machine as the specification
has
> changed. Now I can return the parts to stock by either indivually
doing
> returns from material or a negative mass issue (checking the
quantites
> as it doesn't calculate them correctly). The problem I then have is
the
> demand is still on the system.
>
> Is there anyway I can remove this demand?
>
> Many thanks in advance
>
> Richard Whalebelly
>
> P.S We are using Vantage 6.10.541
>
>
>
>
>
>
> [Non-text portions of this message have been removed]
>
I must be missing something but can someone explain how I can do the
following.

I have a job which has a kit of parts issued to it. However that kit of
parts is no longer required for the machine as the specification has
changed. Now I can return the parts to stock by either indivually doing
returns from material or a negative mass issue (checking the quantites
as it doesn't calculate them correctly). The problem I then have is the
demand is still on the system.

Is there anyway I can remove this demand?

Many thanks in advance

Richard Whalebelly

P.S We are using Vantage 6.10.541
Enter .00001 as the required qty. It rill round to 0 required.


Edward F. Fox, Jr., CPA

Controller

Maxson Automatic Machinery Company

Phone 401-596-0162 a Fax 401-596-1050

www.maxsonautomatic.com <http://www.maxsonautomatic.com/>



_____

From: rwhalebelly [mailto:richard.whalebelly@...]
Sent: Friday, May 25, 2007 10:39 AM
To: vantage@yahoogroups.com
Subject: [Vantage] Issuing material back from a job



I must be missing something but can someone explain how I can do the
following.

I have a job which has a kit of parts issued to it. However that kit of
parts is no longer required for the machine as the specification has
changed. Now I can return the parts to stock by either indivually doing
returns from material or a negative mass issue (checking the quantites
as it doesn't calculate them correctly). The problem I then have is the
demand is still on the system.

Is there anyway I can remove this demand?

Many thanks in advance

Richard Whalebelly

P.S We are using Vantage 6.10.541






[Non-text portions of this message have been removed]