We have Jobs set up with multiple operations such as welding, paint etc. We want to pull the overall cost of the Job with specifics such as material and labour. We have been using Invoice Table but it doesn’t give correct data at times. Wondering if there is any other table to use for the BAQ?
And also Actual costs. If you use subassemblies on jobs, there are TLE “This Level Estimated”, TLA “This Level Actual”, LLE “Lower Level Estimated”, and LLA “Lower Level Actual” costs for each costing bucket.