In what scenarios would MRP ignore the Min Lot Size number, and instead suggest jobs less than the min, based on the Multiple?
For example, on this part I’m expecting jobs of at least 120, but instead getting a job for 112 (which is a multiple of 16).
Its a make to stock job and demand is against the correct site/plant.