Job Splits- Set Up Costs

On Epicor 9.05, what is the criteria for a job split to split the set up costs on an operation.  I have noticed that sometimes it does it sometimes it doesn't do it.


I have confirmed that this happens on 9.05.606 and 9.05.702A