Manufactured part to stock

Ver 6.00.521

I've seen some threads on this, but I'll ask again.

We have a part that we supply some materials for, ship them to a sub-contractor to assemble, then received to stock. Logically this is a manufactured part that is stock. And it needs to be release to job entry as a material (pull from stock). At some point, we will run below our min.

Will Vantage prompt for a job in manufacturing suggestions to make more of this item to stock? Or is this manually monitored?

Thanks.

Eric L. Tyira
Tamglass Tempering Systems

P: (856) 786-1200
F: (856) 786-7606

eric.tyira@...



[Non-text portions of this message have been removed]