Has anyone had any problems with Phantom BOM's not multiplying quantities correctly? I ran across a situation where I had a phantom assembly qty (2)/Parent going into another phantom assembly qty (2) then into a final assembly. The system pushed the parts up to the top level but only gave me enough parts for 2 of the lower level assembly instead of 4 (2 per x 2 per =4).
Has anyone else seen this?
Has anyone else seen this?