RTS - material from a job

We were using a negative material issue however inventory pricing
was messed up by it. We are using average cost method for stock
material and a negative material issue would cause a negative cost
to be averaged in. We went with salvage on the advice of tech
support. This has worked well since we can set the cost, part
number and dimension of the returned material.

It's possible that the problem with negative material issues was
ironed out in 4.0 but we like the salvage function better.

RussD


On 18 Jul 00, at 9:00, Steve Lewis wrote:

Hola everyone! Can someone tell me the BEST way
to receive material into
stock from a job? We over-issue a lot of
material, that I need to return to
stock when the job is complete. I've found the
"receipts from
manufacturing", but this is only for assemblies.
Currently, we do a negative
quantity stock adjustment, and reference the
job, but this seems backwards.




We no longer allow attachments to files. To access/share Report Files, please go to the
following link:
http://www.egroups.com/files/vantage/
(Note: If this link does not work for you the
first time you try it, go to www.egroups.com,
login and be sure to save your password, choose
My Groups, choose Vantage, then choose Files.
If you save the password, the link above will
work the next time you try it.)

Russ Dover
IS Manager
Weaver Industries, Inc.
717 336 7507 phone
717 336 4182 fax
rdover@...
Hola everyone! Can someone tell me the BEST way to receive material into
stock from a job? We over-issue a lot of material, that I need to return to
stock when the job is complete. I've found the "receipts from
manufacturing", but this is only for assemblies. Currently, we do a negative
quantity stock adjustment, and reference the job, but this seems backwards.
Steve, you need to do a negative issue to the job for the over issued
materials!
Jim Stetter
-----Original Message-----
From: Steve Lewis [mailto:slewis@...]
Sent: Tuesday, July 18, 2000 12:00 PM
To: vantage@egroups.com
Subject: [Vantage] RTS - material from a job


Hola everyone! Can someone tell me the BEST way to receive material into
stock from a job? We over-issue a lot of material, that I need to return
to
stock when the job is complete. I've found the "receipts from
manufacturing", but this is only for assemblies. Currently, we do a
negative
quantity stock adjustment, and reference the job, but this seems
backwards.




[Non-text portions of this message have been removed]