Is there a way to backflush setup on quantity only labor entries?
We have Autocomplete Setup checked and all of our operations have a labor Entry “Quantity Only”. We want the system to backflush estimated setup hours without having to start and end setup activity.
Production Detail report shows setup is complete but costs are not showing for setup. Same goes for WIP reports > Setup Costs are not populating
( I was able to find a response from Development as follows:
*The system is working properly, the Auto-complete flag was created only to relieve the setup hours from the loadHours field on the ResourceTimeUsed table and the system is currently doing that when the checkbox is checked and the production operation is completed. *
**If production has already started then setup should be considered over and we’ll complete the setup operation as is. If one need to keep track of the setup time and costs associated with it one will need to enter time against the setup operation before starting the production operation )
We had to create a customization that would create a labor entry “SETUP” when reporting compete so that cost is captured