I have 1 Job of 5 operation with Serial number assign.
Eg at Opr 3, I put NonConf Qty of 2 pcs in MES and DMR created and relevant serial number is assign during this.
DMR also accepted and now this 2 pcs is good pcs.
But somehow I want to minus this 1 pcs from it.
I am using Time n expense with -1, select operation and select serial number. But it is giving error as below screenshot.
I tried changing the status like WIP but still giving same error. How to perform -1 for any completed serial number
In Job Adjustment, there is no option for selecting serial number for which i need to do -1 qty. It is normally doing -1 but when doing time n expense, it is still showing same error