Is there a way to change when job demand gets created? I assumed that it would be created when a job is released (or at the very least engineered), but it looks it’s created as soon as a material is added to a job. Did some testing getting the quantity from PartWhse table and that’s what I’m seeing. I’m wondering if there’s an option somewhere that I’m missing that would change that behaviour.