## Post #1 by @skhayatt
All --
We have some odd (at least I hope it's odd) behavior. When we issue materials to a job, the system is displaying the previous input bin for the resource group of the first operation rather than the current one. This seems to happen when we run MRP, but not when we create a job manually. Specifically,
On Monday, all the resource groups had the same input bin, called "Input"
On Monday, we ran MRP, firmed and released several jobs and issued material to those jobs. The "To Bin" for all the jobs was Input (because no matter what resource group (RG) was first in the BOO, the input bin was Input.)
On Wednesday, we eliminated the Input bin and created a separate bin for each resource group. They are labeled RG01_IN, RG02_IN, etc.
On Wednesday, after we created the new input bins, we created, firmed and release a make-to-stock job. This job was identical to one of the previous MRP jobs. When we issued materials to the job, the "To Bin" value was correct: RG01_IN.
However, when we went in to firm, release and issue materials to any of the previously existing MRP jobs, the "To Bin" value was still the generic Input bin for all.
So... we re-ran MRP (regenerative, infinite, allowed historical dates and ran multi-level pegging) to clear out the old MRP jobs and create new ones. Here's the rub: when we firm, release, and issue materials to one of the new MRP jobs, the "To Bin" value is still the generic Input bin, even though that bin is not assigned to any resource group.
Is there someplace else, besides the input bin of the resource group, that we should be checking?
Thanks.
---
## Post #2 by @bordway
[quote="skhayatt, post:1, topic:37158"]
to clear out the old MRP jobs and create new ones
....any of the previously existing MRP jobs
[/quote]
The phrase "... firm, release and issue materials to any of the previously existing MRP jobs" is confusing me a little.
Just want to clarify whether the jobs you are asking about are brand actually new unfirm jobs created by the last MRP run?
---
## Post #3 by @skhayatt
Yes. Brand new. I think we found the answer. The To Bin of the resource group had been changed, but somehow (human error, I am guessing) our resources, who are all people, morphed into locations that had the same “To Bin” as the groups. Once we removed those all seemed fine.
Still have to test, but I think we are good for now.
Thanks.
---
## Post #4 by @bordway
[quote="skhayatt, post:3, topic:37158"]
somehow (human error, I am guessing)
[/quote]
Just an FYI...
I noticed a minor bug last summer in the entry screens for Resource Groups and Resources.
I can't remember the details, only that I was able to reproduce some unexpected record updates. and that it depended on the order in which the changes were made. i.e. RsrcGrp first or Rsrc's first.
---
**Canonical:** https://www.epiusers.help/t/to-bin-when-issuing-material/37158