I am trying to update the material cost in a quote when a user drags a material from the Engineering/Parts tab to the material. Logs show that ERP.QuoteAsm.InsertMaterial is called. I have created a method directive to update the material, but I cannot find the part being added. The RowMod flag is blank, so if I check for the flag being added “A” or updated “U” nothing is updated or I removed the check all material lines get updated. Is there something else I should be checking to find this new material being inserted?
