V6.0 AR How does Sales Gross Margin Report clculte detail unit p

You should be able to track all the job costs (transaction by transaction) on the Production Detail Report.


--- In vantage@yahoogroups.com, "apt876sp1" <atucker@...> wrote:
>
> In particular the subcontract cost in the report is not correct. The scenario is as follows:
>
> Job for 100 units
>
> 3 subcontracted assemblies each used once per unit
>
>
> assy 1 is $760.00 each
> assy 2 is $385.00 each
> assy 3 is $0.84 each
>
>
> 4 each of assy 3 will be pulled from stock
>
> The subcontract total for the job is $115340.64
>
>
> All subcontract requirements were met two months prior to the begin date of the report and during the report period the only transaction was to ship 1 previously completed unit (shipped qty from 95 to 96).
>
> The report yields a subcontract cost of $1082.64 and the report equation yields $1201.47. (from epicor)I would expect to see $1153.41.
>
> Any info on where to get data, other than parttran with jobnum and dates, would be appreciated.
>
In particular the subcontract cost in the report is not correct. The scenario is as follows:

Job for 100 units

3 subcontracted assemblies each used once per unit


assy 1 is $760.00 each
assy 2 is $385.00 each
assy 3 is $0.84 each


4 each of assy 3 will be pulled from stock

The subcontract total for the job is $115340.64


All subcontract requirements were met two months prior to the begin date of the report and during the report period the only transaction was to ship 1 previously completed unit (shipped qty from 95 to 96).

The report yields a subcontract cost of $1082.64 and the report equation yields $1201.47. (from epicor)I would expect to see $1153.41.

Any info on where to get data, other than parttran with jobnum and dates, would be appreciated.