V6.0 Inaccurate prices in quote material

Problem:

In answering a quote request, a quote is established with details from methods master. A material is set to require an RFQ. Two vendors are selected with one of them set as prime vendor. Both vendors respond and responses are entered. From Buyer Workbench, the vendor who is not the prime vendor is Accepted. The material in the quote now shows the accepted vendor with the other (prime) vendor's price and lead time.

Are we doing something wrong or is it a software problem?

Allen Tucker
IT Vantage Manager
Espey Mfg. & Electronics Corp.
Email: atucker@...
PH: 518-245-4252
Fax: 518-245-4421