Vantage 6.1 and Job Scheduling Board

When we run MRP and let MRP schedule our jobs the material needed
within subassemblies are dated as needed by the operation step it is
associated with. When we reschedule that same job
using the job scheduling board then it dates the material needed by
the date the job starts. Our jobs are 5 to 6 day process and we want
to be able to see what material is required on the date of the
operation it is tied to not the date the job starts. Is there
something we are doing wrong when we run the job scheduling board.
When we run the Job Scheduling board we are backward scheduling.

Thanks
Dan Ernst
Computer Services
Correct Craft, Inc.