WIP Capture Error

When we try to run the WIP capture report and process we get this error:

Type:3
Program:agent/RunTask.p
Method:Main-Block
Table:
Field:
Rowid:
Message:Program im/imr70.p rasied the 4GL Stop condition with the following message:

i check the error logs and see this message:

[18/03/16@15:49:43.719-0800] P-008180 T-008140 1 AS – (Procedure: ‘abtSetValue pe/PEABT.p’ Line:25868) The total length of the fields in an index exceeds max key size. Index PRidx2 of table (TEMP-TABLE)ttABTWork (129) (11353)

I have it narrowed it down to something happened on 2/19.
I can run the report for any day in February without getting an error except 2/19.

Any ideas how to fix this?

If you have access to EpicWeb… see if AnswerBook #:
16359MPS helps

yeah that solved it.

Thanks!