Hello everyone. We are on Vantage 8.408B.
Since Epicor does not allow partials on parts in Inspection process (pass
all or fail all) we have been holding Inspection Stock in DMR under a
description of Inspection Hold. However, we loose visibility or tracking of
this stock on hold with regards to MRP and other processes and reports. Has
anyone found a workaround to address this? Please help?
Thanks in advance.
Best Regards,
Herby Dallard
Information Technology Engineer
Endicott Research Group
hdallard@...
607-754-9187 ext. 3078
www.ergpower.com <http://www.ergpower.com/>
[Non-text portions of this message have been removed]
Since Epicor does not allow partials on parts in Inspection process (pass
all or fail all) we have been holding Inspection Stock in DMR under a
description of Inspection Hold. However, we loose visibility or tracking of
this stock on hold with regards to MRP and other processes and reports. Has
anyone found a workaround to address this? Please help?
Thanks in advance.
Best Regards,
Herby Dallard
Information Technology Engineer
Endicott Research Group
hdallard@...
607-754-9187 ext. 3078
www.ergpower.com <http://www.ergpower.com/>
[Non-text portions of this message have been removed]