Everything is make to order with “fake” part numbers from configurators. Everything is backflushed. We always make the desired job qty, however sometimes a whole part will be scrapped and more material will have to be used. This is being handled either not at all right now or “out of the system” i.e someone goes back later and manually issues more material to the job based on the qty that had to be scrapped.