It would be in the first place to add depth to the duration of the ops in the manufacturing process. The job is already a fact, and we know what the Method is comprised of. However, in the quoting prcess it would be nice if we can create a part with MoM that contains most of the assemblies required and run that through the integration so we have an idea what the manufacturing time is of all the assemblies (and cost).