Anyone know what happens in APS 8.03 if you change a resource on an
operation on a job after the operation has already started in
production. The operation has been updated in the master routing, but
there is a job released to the floor that had an incorrect resource
attached.
Thanks
Mike McGee PH: 931-432-1853
Materials Manager Fax: 931-432-1889
Flexial Corporation mmcgee@...
1483 Gould Drive www.flexial.com
Cookeville TN, 38501
NOTICE: This e-mail, including any attached files, is the property of
Flexial Corporation and as such may be legally privileged and is solely
for the intended recipient(s). Any unauthorized use, dissemination,
disclosure, copying or printing of this e-mail, or any attached file,
without the permission of Flexial Corporation is strictly prohibited.
[Non-text portions of this message have been removed]
operation on a job after the operation has already started in
production. The operation has been updated in the master routing, but
there is a job released to the floor that had an incorrect resource
attached.
Thanks
Mike McGee PH: 931-432-1853
Materials Manager Fax: 931-432-1889
Flexial Corporation mmcgee@...
1483 Gould Drive www.flexial.com
Cookeville TN, 38501
NOTICE: This e-mail, including any attached files, is the property of
Flexial Corporation and as such may be legally privileged and is solely
for the intended recipient(s). Any unauthorized use, dissemination,
disclosure, copying or printing of this e-mail, or any attached file,
without the permission of Flexial Corporation is strictly prohibited.
[Non-text portions of this message have been removed]