Alternate Method BOM backflushing check

When we create a new job entry with the alternative method, a BOM is loaded, but the backflush checkbox is enabled in the alternative BOM. I would like to understand where this is set to default with backflush enabled. Is there any way to uncheck it from the source?

4o mini

Backflush is set at the Part → Plant level. It pushes from there to the job if that part is in the BOM and has a related operation.

3 Likes