Good morning,
We finally purchased APS! I am working on rearranging our resource groups, operations, and capabilities. One thing I would like to do is setup our Final QC Inspection op to always pull into a job with the sequence 900. This convention, to set the final inspect op to 900, has been done manually for years. When I drag and drop an operation from Job Entry > Engineering > Operation Master into the operation list for a job, the operation sequence just keeps increasing.
I am just wondering if there is a way to automatically pull in a new operation with a predetermined op sequence number. If so, where would I assign that?
Thanks!!