I executed the BOM cost report for PN SSP-100(Avg Cost) and first part listed, PN 102-1(Avg cost), does not have any cost listed in the BOM costing report whereas I checked the PN 102-1 have cost in the part tracker.
This is very old BOM and the parts have not changed. Any thoughts?