Default scrap percentage for operations in quoting

I’m looking for the area where the default scrap percentage is set for operations that are added to a quote. Our operations are coming in with 5% scrap set and I want it to be 0%. I have searched for it but haven’t been able to find where this is set. Can anyone point me in the right direction, please and thank you?

I didn’t think there was a default! I’ll be interested to find that out too.

I wrote BPM’s combined with a customization to do it here in engineering workbench based on operation and material. If there was a default to set that would have been much easier.

I wondered if it was a BPM but it seemed to appear recently when we went up to 10.1., though I have to admit that I haven’t been working much with adding operations in a quote until recently.

Update: It is a Method Directive BPM that was done for us a few years ago by a consultant. I have disabled it.

I recently started a document that lists all of our BPM’s just for that reason. When we went to 10.1 there was a BPM that someone did for us that killed new quote creation. It took us a long time to figure out what was going on, as we were relying on memory to think about what could be causing the problem. Glad you figured it out.

1 Like