Hey there,
I’m connecting an EpiCombo box to ProjectTask.TypeID in a dashboard tracker like this:
But all I get when I click on the dropdown is:

I’ve deleted and reentered the control a couple of times, thinking I was doing something wrong.
Think it’s just broken? 10.2.700.12
Right-click, open with gets the task type entry okay.
I could do it with a BAQ combo, but would rather not.
Thanks,
Joe
ckrusen
(Calvin Krusen)
2
Have you thought about a RetrieverCombo?
jdtrent
(Joe D Trent)
3
Hey Calvin,
Well, that got me all excited, but it does the same thing. All my other combo boxes on this dashboard work just fine. Just this one last piece. . .
Thanks,
Joe
jdtrent
(Joe D Trent)
4
Doh.
Full confession mode: Task Type and Project Checklist Task Type are not the same thing.
That is all.
Joe