We are in the process of prototyping. We are on V5.0.312. We are
having the following problem with Inventory reporting. Can anyone
using a Standard cost system help us out with relieving subassemblies
as material from a job on it's parent part?

The SubAssm1 comes into the job as WIP Material at the total standard
cost of the subassembly (Std Mat., Std. Labor, Std. Burden), but then
the main assembly wip costs only get relieved of the material portion
of the subassembly in WIP material. The labor goes off the job as
WIP labor and the burden as WIP burden. Since the labor and burden
of the assembly came into the job as material, it should also relieve
WIP Material.