We have process where we do the set-up of operation with a sub-assembly (lot tracked). We do the set-up again after 8hrs and we use again sub-assembly (lot tracked).
Any body have experience with this?
We have process where we do the set-up of operation with a sub-assembly (lot tracked). We do the set-up again after 8hrs and we use again sub-assembly (lot tracked).
Any body have experience with this?
Are you needing to issue the Lot Tracked Sub Assembly to the Job?
Thanks Jason.
Yes, need to issue the lot tracked sub assembly to the job.
Have you not been able to use “Issue Material”?
I think you would “Issue Assembly” in this case?