We are running into an issue with multi-site jobs and generating the correct demand for materials. Here’s our scenario:
Top Level Part - Manufactured at Site A
Lvl 1 Subassembly - Manufactured at Site B
Lvl 2 Subassembly - Manufactured at Site A
Site A runs MRP, Site B does not.
I’ve got a job started for the top level part, but I cannot use “Pull as Assembly” on the lvl 1 subassembly because it is manufactured at a separate site. I can use make direct with it set up as a material, but there is no demand generated to make the lvl 2 subassembly at site A, transfer to site B, manufacture lvl 1 at site B, then transfer back to site A.
If anyone else has come across a similar scenario, I’d love to hear how you’re facilitating this.
Multi-site jobs and BOMs seem to be a theme this week!
I was about to ask a bunch of questions about setup, but this here - yeah, I don’t see how MRP will make the demand if it doesn’t run. Am I missing something?
With MRP being off for Site B this will not work well for you as @jkane said.
AFAIR, you only need part plant (site) record for each part as transfer for the appropriate locations for this to work and they should be pull as assembly.