Operation standard issues

I have been trying to figure out what setting I am missing here. Currently in our test system in quote engineering when I enter a new operation the Operation standard populates immediately, but in our pilot system the operation standard only populates after the line is saved. I have looked through the Configuration/Maintenance settings for company and site, but have come up empty. I looked through all our BPM’s and nothing references OpStd, and I added a new operation with the dev tools enabled to trace the changes, but they show the same process. Has anyone come across this issue?

1 Like