I found it. It was under Production Management -> Engineering -> General Operations -> Mfg Lead Time Calculation. Seems strange to be under Engineering, but oh well.
--- In vantage@yahoogroups.com, "Tim Vonderhaar" <tvonderhaar@...> wrote:
>
> Using 9.05.607A, there is a Planning tab under the Part menu that lists a Cumulative Time for the part. In our case, the number is always zero. According to help, it is a system calculation that is the total time required to generate the part, including lower level parts. However, help doesn't indicate what needs to happen to get the calculation to run. We have a full MOM for the part, have a minimum set for the part, have run MRP and scheduling but the number remains zero. Is there some special menu or step required?
>
> Thanks,