Hello
We have noticed that some jobs estimated hours at the job header level (the TLE hours field at the assembly) does not match the summation of the estimated hours for the operations on the same job.
I can say that we do use planned hours, schedule jobs and do add or delete operations depending on the job (we are a repair shop where everything is unique). We have set part numbers for repair types and pull in default methods to create base jobs. Jobs would change from there either by adding/subtracting estimated hours or adding or subtracting operations.
Does anyone know why the estimated hours on the header does not change as we change the operation detail? If so, how can we correct it. Epicor is perplexed, offered us a fix where we have to call out specific jobs, but has not offered us much help beyond that.
Thanks
Mike Hoge