If you run the same part on the same workcenter every time, then common
standards would work for you. But in our "Job Shop" environment, a
workcenter, such as a drill press sees a variety of different parts and each
part has its own PPH (Pieces per Hour) for that operation. A mass change
for standards would not work for us.
John Rodewald
Sr. CAD Engineer
National Tube Form
A Leggett & Platt Company
QS9000 Certified
Phone: (260) 478-2363 ext. 205
Cell: (260) 348-4891
Fax: (260) 478-1043
John.Rodewald@...
-----Original Message-----
From: monicag@... [mailto:monicag@...]
Sent: Thursday, May 16, 2002 5:50 PM
To: vantage@yahoogroups.com
Subject: Re: [Vantage] Update BoM Operation Standards
The standards that are in the master table when the BoM is first created is
saved with that BoM. Engineering is the only ones allowed to create and
change BoMs. From one order/job to the next, they may have made a change in
the BoM if part results were not what they wanted. So when Production
Control creates a new job they have to copy from Methods of Manufacturing to
get the latest BoM.
I can see a mass replace for operations, workcenter, etc but not to update
the standards to what's currently in the master. This does not make sense
like you said, so I didn't know if I've been overlooking something.
Monica
******************************************************************
http://groups.yahoo.com/group/vantage/files/.
already linked your email address to a yahoo id to enable access. )
(1) To access the Files Section of our Yahoo!Group for Report Builder and
Crystal Reports and other 'goodies', please goto:
http://groups.yahoo.com/group/vantage/files/.
(2) To search through old msg's goto:
http://groups.yahoo.com/group/vantage/messages
(3) To view links to Vendors that provide Vantage services goto:
http://groups.yahoo.com/group/vantage/links
Your use of Yahoo! Groups is subject to http://docs.yahoo.com/info/terms/
standards would work for you. But in our "Job Shop" environment, a
workcenter, such as a drill press sees a variety of different parts and each
part has its own PPH (Pieces per Hour) for that operation. A mass change
for standards would not work for us.
John Rodewald
Sr. CAD Engineer
National Tube Form
A Leggett & Platt Company
QS9000 Certified
Phone: (260) 478-2363 ext. 205
Cell: (260) 348-4891
Fax: (260) 478-1043
John.Rodewald@...
-----Original Message-----
From: monicag@... [mailto:monicag@...]
Sent: Thursday, May 16, 2002 5:50 PM
To: vantage@yahoogroups.com
Subject: Re: [Vantage] Update BoM Operation Standards
The standards that are in the master table when the BoM is first created is
saved with that BoM. Engineering is the only ones allowed to create and
change BoMs. From one order/job to the next, they may have made a change in
the BoM if part results were not what they wanted. So when Production
Control creates a new job they have to copy from Methods of Manufacturing to
get the latest BoM.
I can see a mass replace for operations, workcenter, etc but not to update
the standards to what's currently in the master. This does not make sense
like you said, so I didn't know if I've been overlooking something.
Monica
******************************************************************
>Hello,part
>
>We are still on Vantage 4.
>
>I've finally discovered why all our jobs do not have the same operation
>standards as in the master table. For some reason when a BoM is created for
>a part it will pull in the current operation standard, but then it actually
>saves it with that BoM. So, subsequently every new job created for that
>number uses that standard and not the newly updated standards in the masterupdated
>table.
>This then is throwing off our scheduling module.
>
>I cannot seem to find any way to automatically or massively update the
>standards that are stuck in the BoMs, other than to tell Engineering that
>they need to go through every operation in every BoM and type in the
>standards. And they will need to do this every time we tweak the standards.saves
>They will definitely wring my neck.
>
>If anyone has any suggestions or comments "please" let me know. I do not
>understand why this works this way, because all the other modules just
>the id and pulls in the current info each time.already linked your email address to a yahoo id to enable access. )
>
>Thanks ahead,
>
>Monica Greybar
>System Info Mgr
>Colorado Crystal Corp
>
>
>
>Useful links for the Yahoo!Groups Vantage Board are: ( Note: You must have
>(1) To access the Files Section of our Yahoo!Group for Report Builder andCrystal Reports and other 'goodies', please goto:
http://groups.yahoo.com/group/vantage/files/.
>(2) To search through old msg's goto:http://groups.yahoo.com/group/vantage/messages
>(3) To view links to Vendors that provide Vantage services goto:http://groups.yahoo.com/group/vantage/links
>Useful links for the Yahoo!Groups Vantage Board are: ( Note: You must have
>Your use of Yahoo! Groups is subject to http://docs.yahoo.com/info/terms/
>
>
>
already linked your email address to a yahoo id to enable access. )
(1) To access the Files Section of our Yahoo!Group for Report Builder and
Crystal Reports and other 'goodies', please goto:
http://groups.yahoo.com/group/vantage/files/.
(2) To search through old msg's goto:
http://groups.yahoo.com/group/vantage/messages
(3) To view links to Vendors that provide Vantage services goto:
http://groups.yahoo.com/group/vantage/links
Your use of Yahoo! Groups is subject to http://docs.yahoo.com/info/terms/