WIP Report BAQ

,

I am looking to build a WIP report BAQ that can be joined with other tables. What I specifically see is the JobNumber with the Labor Burden, Material, Sub, and MtlBurden cost components along with the ToDate, ToInventory/ToJob, COS/MFG-VAR, and WIP categories. I can get the ToDate from the JobAsmbl Table, but am not sure how to split it out from there. Does this information exist in a table somewhere, or does it need to be calculated somehow?

Most of it is in summed into JobAsmbl then you need to remove what has been shipped or issued to finished goods.

My baq is uploaded to the thread below. It is not perfect, but within 2K on 5M.