I have a part on a job which is going to yield another part, so I have 2 job
parts. I clicked on production yield for the job and expected that it would
allow me to assign the ratio between the main part and the job part to
accurately calculate costs, but when I assign the ration the production quantity
is doing the opposite in what I expected in that the quantity for that part is
going down and the job part quantity is going up, no matter which way I try to
assign the ratio
Anyone else using Production Yields that could explain this?
[Non-text portions of this message have been removed]
parts. I clicked on production yield for the job and expected that it would
allow me to assign the ratio between the main part and the job part to
accurately calculate costs, but when I assign the ration the production quantity
is doing the opposite in what I expected in that the quantity for that part is
going down and the job part quantity is going up, no matter which way I try to
assign the ratio
Anyone else using Production Yields that could explain this?
[Non-text portions of this message have been removed]