Epicor 9: Need to over-ride scheduling requirement at the job-opera

We have a need when creating jobs that we would like to over-ride what Epicor “thinks” time-wise will take to perform an operation.  We need to put it our own “actual” time it should take at the job-operation level and have the scheduling system use it.  Is there any possible way that we could do this???

 