How to interpret Production Planner Workbench results

You are getting beyond what I have ever needed as we are 99.9 % single level boms.

Here is a thread where @timshuwy uploaded his bom_explode which I have run for a single and it does tell you what parts are short.

I added a thru parameter and it gave me results. :man_shrugging: