Hi All,
If I create a part A and add material to it in eng work bench.
Then I add that part to another part B
And create a job to manufacture part B were do I look to see were the material from
Material from Part A is consumed (manufactured internally)
Material from part B is consumed (manufactured internally)
If part a is a bar 1/2" dia. x 12 " long and I have 24’ inches in stock I would like to see the material consumed and to what job
Thanks